Build Progress: From Foundation to Finish-Out

Every phase of this new construction home in Johnson City, TX has been documented from the first stake in the ground, built by ClearBuild Texas with vetted, licensed trade partners on 5.06 acres in the Hill Country.

Built From the Ground Up

Status: interior finish-out underway

Updated October 19, 2026

  1. Real photo of foundation forms and under-slab plumbing at 168 Crooked Creek Court, Johnson City, TX, December 2024

    Phase 01

    Foundation

    Rebar layout and vapor barrier on the 5.06-acre homesite. The slab footprint covers 5,263 SF of framed area.

    Real photo · Slab prep, December 2024

  2. Real photo of the foundation concrete pour at night at 168 Crooked Creek Court, Johnson City, TX

    Phase 02

    Concrete Pour

    Pump truck pour completed at night. Slab cured clean, ready for framing.

    3,560 SF Air-Conditioned Living

    Real photo · Night pour

  3. Real photo of wall framing on the slab at 168 Crooked Creek Court, Johnson City, TX, May 2025

    Phase 03

    Wall Framing

    Walls up. The footprint of the single-story plan becomes visible against the live oaks and Hill Country horizon.

    Real photo · Wall framing, May 2025

  4. Real photo of the vaulted roof framing at 168 Crooked Creek Court, Johnson City, TX, 2025

    Phase 04

    Roof Structure

    Hip roof trusses set. The vaulted great room ceiling structure is visible, and the 3,560 SF starts to feel like a home.

    Real photo · Roof framing, 2025

  5. Real photo of Zip System sheathing and window openings at 168 Crooked Creek Court, Johnson City, TX, September 2025

    Phase 05

    Exterior Sheathing & Windows

    Zip System sheathing complete. Black-framed windows installed. The exterior envelope is sealed and weathertight.

    Real photo · Zip sheathing, September 2025

  6. Real photo of interior framing under the vaulted great room clerestory at 168 Crooked Creek Court, September 2025

    Phase 06

    Interior Framing & Rough-In

    Interior walls framed. Vaulted great room with clerestory windows. Electrical, plumbing, and HVAC rough-in.

    Real photo · Interior framing, September 2025

  7. Real photo of the limestone veneer, painted lap siding and standing-seam metal roof at 168 Crooked Creek Court, September 2026

    Phase 07

    Exterior Cladding

    HardiePlank siding, Hill Country limestone veneer, standing-seam metal roof, and black-frame windows installed. Exterior envelope complete.

    Real photo · Exterior cladding, September 2026

  8. Real photo of the vaulted great room with floor-to-ceiling limestone fireplace and clerestory windows at 168 Crooked Creek Court, October 2026

    Phase 08Current

    Drywall & Interior Finish-Out

    Drywall finished. Floor-to-ceiling limestone fireplace, cedar porch ceilings, cedar garage door, black-framed glass doors and the driveway are in. Cabinetry is being installed.

    Real photo · Great room, October 2026

Swipe or use the arrows to move through the eight phases.

See 168 Crooked Creek Court in Person

Private tours are by appointment and escorted, because the home is an active construction site.